EasyManua.ls Logo

B&C Technologies FM7 - Cycle Programming Sequence

B&C Technologies FM7
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cycle Programming Sequence
Cool Down
3
INC
Fill to Temp
3
INC
Drain
3
INC
Cold Water
3
INC
Hot Water
3
INC
Heating
3
INC
Chem 1
3
INC
Chem 2
3
INC
Chem 3
3
INC
Chem 4
3
INC
11
To turn on a function, press Enter, to turn off a function press Reset. Press Enter to edit a numerical
value (RPM, Time, etc.). Note: Setting a function to zero DOES NOT disable that function.
Min. Level
ENTER
3
INC
Max Level
3
INC
Temp.
3
INC
WDT
3
INC
Agitation
3
INC
RPM
More information on page 15
Level
3
INC
Temp.
3
INC
WDT
3
INC
Agitation
3
INC
RPM
More information on page 16
ON drains the machine.
-- means the drain is closed.
ON to turn on the cold water valve.
-- means the valve is off.
ON to turn on the hot water valve.
-- means the valve is off.
ON turns on the heat output, you
will be prompted to enter the temperature.
-- means the heat output is off.
ON to turn on chemical signal 1, and
flush cup 1 in the supply dispenser.
-- means the supply is off.
ON to turn on chemical signal 2, and
flush cup 2 in the supply dispenser, if
equipped. -- means the supply is off.
ON to turn on chemical signal 3, and
flush cup 3 in the supply dispenser, if
equipped. -- means the supply is off.
ON to turn on chemical signal 4, and
flush cup 4 in the supply dispenser, if
equipped. -- means the supply is off.
continued

Related product manuals