EasyManua.ls Logo

Banner XS26-2de User Manual

Default Icon
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
XS/SC26-2 and SC10-2 Safety Controllers
Instruction Manual
Original Instructions
174868 Rev. P
26 April 2019
©
Banner Engineering Corp. All rights reserved
174868

Table of Contents

Other manuals for Banner XS26-2de

Question and Answer IconNeed help?

Do you have a question about the Banner XS26-2de and is the answer not in the manual?

Banner XS26-2de Specifications

General IconGeneral
Supply Voltage10 - 30 V DC
Housing MaterialPlastic
Output TypeDigital
Output Current100 mA
Protection RatingIP67
OutputPNP
Sensing Distance2 m
Connection TypeCable

Summary

About This Document

Important . . . Read This Before Proceeding!

Critical safety instructions and user responsibilities for proper operation of the Safety Controller.

XS/SC26-2 Overview

SC10-2 Overview

Specifications and Requirements

System Installation

Installing the Software

Step-by-step instructions for downloading and installing the Banner Safety Controller Software.

Installing the Safety Controller

Guidelines for mounting the Safety Controller on a DIN rail and environmental considerations.

Installation Considerations

Appropriate Application

Emphasizes the controller is complementary and requires risk assessment for safe application.

Safety Circuit Integrity and ISO 13849-1 Safety Circuit Principles

Discusses safety circuit integrity levels, Categories, and Performance Levels based on ISO 13849-1.

Getting Started

Creating a Configuration

Outlines the steps required to complete and confirm a configuration for the safety controller.

Saving and Confirming a Configuration

Explains the process of verifying, saving, and sending a configuration to the controller.

Software

XS/SC26-2 Onboard Interface

XS/SC26-2 Configuration Mode

Describes entering Configuration Mode to copy or write configurations to/from an SC-XM2/3 drive.

System Checkout

Schedule of Required Checkouts

Outlines the schedule for initial setup, commissioning, periodic, and daily checkout procedures.

Commissioning Checkout Procedure

Details the procedure for verifying system operation before placing the machine into service.

Initial Setup, Commissioning, and Periodic Checkout Procedures

Describes startup configuration, verifying input/output function, and checking safety operation.

Status and Operating Information

Lockout Conditions

Explains input lockout conditions and system faults that may cause the controller to turn off safety outputs.

Recovering from a Lockout

Provides steps to recover from a lockout condition, including system reset.

Troubleshooting

Standards and Regulations

Related product manuals