7
24 Pick up the black handle and screw you removed earlier and put
them back on the unit.
25 Make sure the handle is in the OFF position.
26 Pick up one of the two 14’ clear vinyl pickup tubes and
remove the twist ties.
27 Straighten the clear vinyl pickup tube, measure 7’
(or applicable length) and cut.
If 7’ is too long, cut to suit your needs. We just do not want you
to cut the tubes too short.
28 You now have two 7’ (or applicable length) tubes.
29 Pick up the other 14’ clear vinyl pickup tube and repeat the process
above.
30 You now have four 7’ (or applicable length) clear vinyl pickup tubes
to go into your four products.
31 Take those four 7’ (or applicable length) clear vinyl pickup tubes and
attach rmly over the metering tips you installed earlier.
32 Pick up the gallon cap and slide one 7’ (or applicable length) tube
through predrilled 3/8” cap hole.
33 Pick up weight and slide 7’ (or applicable length) tube through the
center of the weight.
34 Pick up foot valve strainer and press rmly into the end of the 7’
(or applicable length) tube.
35 Repeat the steps above for the three remaining 7’
(or applicable length) tubes.
36 Remove cap(s) from your gallons of shampoo/conditioner
37 Place your 7’ (or applicable length) tubes (which now have a cap,
weight and foot valve strainer) into your gallons of
shampoo/conditioner and screw cap on tightly.