Vulcano 12 2016
7. WATER FILLING
pilot lamp switches on (fig. 2 E). Unplug the
machine, unscrew the safety valve plug just slightly (360°)
(fig. 1) so that all the steam comes out (manometer at 0
BAR). Completely unscrew the valve plug with care and
wait at least 5/10 minutes.
Then fill the boiler with water (fig. 5) paying attention not
to overfill it (section 4.1). Screw the valve plug again (fig.
1), turn on the machine and wait for the boiler lamp to
switch off (fig. 2 D). Now the iron is ready again.
While refilling the boiler, do not spill water onto the machine.
In the event this should happen, dry immediately in order
to avoid electrical risks.
8. BOILER DISCHARGE
Empty the boiler periodically. Carry out this operation when the ironing board mod.
VULCANO is turned off, cold (manometer at 0 BAR) and the plug disconnected.
Wait at least 1 hour after the switching off. During this procedure, wear proper gloves in
order to avoid accidental burns.
Unscrew the valve plug and open the discharge tap (fig. 1), wait for all the water to
come out and then close the tap again. The tap might get clogged: in this case, use
an iron wire with a diameter of 3-4 mm to unclog it.
9. GOOD FUNCTIONING
The ironing board mod. VULCANO was designed for the ironing of domestic garments.
It can be used maximum 20 hrs. per week (subdivided in many times) or 80 hrs. per
month.
Fig. 4
Fig. 5