EasyManua.ls Logo

Bauer BG 30 - Maintenance;Repair; Maintenance Schedules

Bauer BG 30
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance/repair
Maintenance schedules
The following lubrication plan shows an overview of all relevant lubrication points on the equipment.
If there is a central lubrication system, some of these lubrication points will be automatically lubri-
cated. Components in this table marked with "*" must also be manually lubricated. If no central lu-
brication system is present, all lubrication points must be manually lubricated.
Lubrication plan - Base machine

Related product manuals