EasyManua.ls Logo

Bauer RAINSTAR A1 - Service and Maintenance

Bauer RAINSTAR A1
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual for BAUER RAINSTAR A1, A2
27
17 SERVICE AND MAINTENANCE
We cannot emphasise often enough that proper service at the right time is essential for the operating reliability
and service life of a machine. At the end of every irrigation season, the RAINSTAR A1, A2 should be checked
and cleaned thoroughly and all parts should be greased carefully.
Machine part Service interval Lubricant, grease, oil
1. Helically grooved spindle of
the winding mechanism
every 250 service hours or once
a year
Alvania Grease 3
2. Driving chain of winding
mechanism
every 250 service hours or once
a year
Alvania Grease 3
3. Driver (spindle nut) of
winding mechanism
every 250 service hours or once
a year
Alvania Grease 3
4. Driving chain as required Alvania Grease 3
5. Change-speed gear
First oil change after 500 service
hours and then after 500 800
service hours or once a year
0,9 l of oil SAE 90 EP
6. Screwed joints – drawbar after 500 800 service hours or
once a year
Tightening torque 45 Nm

Related product manuals