EasyManua.ls Logo

Baumatic BRCI2575 - Installation Aperture and Ventilation; Installation Space Dimensions

Baumatic BRCI2575
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMPORTANT: DO NOT HEAT THE DOOR SEAL ON ANYTHING BUT
THE LOWEST HEAT SETTING, OR HEAT THE SEAL FOR A LONG
PERIOD OF TIME. OTHERWISE DAMAGE MAY BE CAUSED TO
THE DOOR SEAL, WHICH WOULD NOT BE RECTIFIED UNDER
THE GUARANTEE FREE OF CHARGE.
IMPORTANT: WHEN YOU HAVE REVERSED THE DOORS OF THE
APPLIANCE; AS YOU HAVE PLACED THE APPLIANCE ON ITS
SIDE, YOU MUST WAIT FOR 8 HOURS BEFORE SWITCHING THE
APPLIANCE BACK ON.
Aperture dimensions and ventilation requirements
The appliance aperture should be:
Height- 1772-1776 mm
Depth- 550 mm
Width- 560 mm
o If necessary, you should utilise extra filler shelves to fill any
additional space that you have in the aperture.
o The diagram on the next page shows the ventilation cut outs
needed in order to install the appliance. For the product to
operate correctly it is essential to allow adequate air circulation
to cool down the condenser located in the rear part of the
appliance.
25

Related product manuals