EasyManua.ls Logo

Baxi Combi 80Eco User Manual

Baxi Combi 80Eco
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Baxi Combi 80Eco
Gas Fired Wall Mounted Combination Boiler
Installation and
Servicing Instructions
Please leave these instructions with the user
Question and Answer IconNeed help?

Do you have a question about the Baxi Combi 80Eco and is the answer not in the manual?

Baxi Combi 80Eco Specifications

General IconGeneral
BrandBaxi
ModelCombi 80Eco
CategoryBoiler
LanguageEnglish

Summary

Introduction to Baxi Combi 80Eco Boiler

Installation Guidelines

Specifies installation suitability for G.B. & I.E., requiring a CORGI Registered Installer and adherence to regulations.

Appliance Operation Modes

Technical Data and Specifications

Dimensions and Fixing Requirements

System Details and Requirements

System Filling and Pressurising Procedures

Outlines the process for initial filling and pressurising of the system, adhering to water regulations.

Pressure Relief Valve Safety

Specifies the pressure relief valve setting (3 bar) and requirements for the discharge pipe routing and safety.

Site Requirements for Installation

Installer Qualifications and Regulations

Stresses that installation must be by a CORGI Registered Installer adhering to GAS SAFETY, BUILDING REGULATIONS, and I.E.E. Wiring Regulations.

Gas Supply Installation

Details gas installation requirements according to BS6891 and the 22mm copper tail connection at the gas service cock.

Boiler Installation Procedures

Initial Preparation and Template Use

Covers checking gas supply, positioning the fixing template, marking holes for wall plate and pipes, and cutting flue hole.

Fitting the Boiler to the Wall Plate

Guides on lifting the boiler, engaging it onto the wall plate hooks, ensuring it is level, and securing it to the wall.

Horizontal Flue Assembly

Provides step-by-step instructions for fitting the horizontal flue, including measuring, cutting, and securing the ducts.

Horizontal Flue Assembly (Continued)

Continues flue fitting, covering inserting ducts through the wall, sealing, and making good around the installation.

Making Electrical Connections

Explains how to connect the mains input cable, route it to the terminal block, and connect external controls if used.

Preliminary Electrical System Checks

Outlines essential pre-commissioning checks including ground continuity, resistance, short circuits, and polarity.

Commissioning the Baxi Combi 80Eco

Boiler Commissioning Steps

Covers opening water supply, purging DHW system, pressurising, gas supply, and soundness tests.

Checking and Adjusting Burner Pressure

Details connecting a pressure gauge, checking gas supply pressure, and adjusting burner pressure if required.

Finalizing the Installation

Annual Boiler Servicing Procedures

Annual Servicing Requirements

Recommends annual servicing by a competent person, ensuring the boiler is cool and supplies are isolated.

Annual Servicing Steps and Filter Cleaning

Covers removing internal components, cleaning filters, and completing the service log book.

Illustrated Wiring Diagram

Fault Finding and Troubleshooting

Initial Fault Finding Checks

Covers checking power, system pressure, electrical systems, external controls, and fuses before troubleshooting.

Central Heating Troubleshooting Flowchart

Provides a step-by-step diagnostic flowchart for identifying and resolving central heating operational faults.

Domestic Hot Water Troubleshooting Flowchart

Offers a diagnostic flowchart for troubleshooting issues related to domestic hot water supply and operation.

Troubleshooting Solutions (Sections A-E)

Details specific solutions for faults identified in sections A through E, including checks for voltage and component issues.

Troubleshooting Solutions (Sections E-H)

Provides troubleshooting solutions for faults identified in sections E through H, covering gas at burner and voltage checks.

Troubleshooting Solutions (Sections I-K)

Details troubleshooting solutions for faults identified in sections I through K, focusing on flame sensing and thermostat issues.

Short Parts List for Replacement

Related product manuals