Specification
22
Nominal performance data (using APM)
Design heat loss kW 48 24 
Plant size ratio (PSR) PSR 0.5 1 1.5 4
Annual heat generated for space heating kWh    
Annual heat generated for water heating kWh    
Annual auxiliary heat requirement kWh 28008.4  114.7 0
'C?RCDAGCLAWGLRFCFC?RGLEQC?QML % gross    
'C?RCDAGCLAWGLRFCQSKKCPQC?QML % gross    
Electricity consumed in the heating season kWh
e
   
Electricity consumed in the summer season kWh
e
   
Heating plant emission rate (HPER) GC ,
2
G4D
h
  0.201 0.201
=OA@KJPULE?=HPSE?A@=EHUDA=PEJCLANEK@O>EIK@=H
PSR HPER
0.5 
 0.282
0.7 
0.8 
 
1 
1.1 0.225
1.2 
 
1.4 0.207
1.5 to 4 0.201
Intermediate ratings
The performance is difficult to predict with certainty due to variable patterns of use determined by
householder settings, outdoor temperatures etc. This directly affects heat and electricity demand and
production. The estimates are based upon the best available information, but are given as guidance only
and should not be considered as a guarantee.
Clearances
1. A flat vertical area is required for the installation of
the boiler.
2. These dimensions include the necessary clearances
around the boiler for case removal, spanner access and
air movement. Additional clearances may be required
for the passage of pipes around local obstructions such
as joists running parallel to the front face of the boiler.
"JOQNAPD=PPDANAEO=@AMQ=PA?HA=N=J?ABKN=JU
lifting equipment.
200mm Min
950mm
450mm
300mm Min
5mm Min
60mm Min
5mm Min
450mm Min
For Servicing
Purposes
In Operation
At Least 1.5°
426mm