EasyManua.ls Logo

Baxi Solo HE User Manual

Baxi Solo HE
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
© Baxi Heating UK Ltd 2012
Solo HE A Range
Wall Mounted Powered Flue Condensing
Boilers Gas Fired Central Heating Units
Installation & Servicing Instructions
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
Question and Answer IconNeed help?

Do you have a question about the Baxi Solo HE and is the answer not in the manual?

Baxi Solo HE Specifications

General IconGeneral
ModelSolo HE
Fuel TypeNatural Gas
Efficiency RatingA
MountingWall Mounted
Warranty2 Years
Central Heating Flow Temperature Range30 - 80 °C
Flue OptionsHorizontal/Vertical
Output Rating24kW
Output24kW

Summary

Baxi Solo HE A Range Installation and Servicing Instructions

Benchmark Scheme and Building Regulations

Building Regulations and Commissioning

Explains notification via Competent Persons Schemes and the role of the Benchmark Checklist.

Important Installation, Commissioning, Service & Repair Information

Legal and Regulatory Compliance

Covers GB and IE requirements, including Gas Safety and Building Regulations.

Safe Manual Handling Procedures

Introduction to Baxi Solo HE A Boilers

Product Description and Specifications

Details the Baxi Solo HE A range, outputs, gas type, and system compatibility.

Boiler Operation Sequence

Appliance Operation Flowchart

Illustrates the step-by-step process of the boiler's operation.

Technical Data and Specifications

System Design and Water Treatment

Water Circulating System Requirements

Details conditions for open vent and sealed water circulating systems.

System Controls and Wiring

System Control Requirements

Details requirements for zone controls, timers, and boiler interlocks for compliance.

Sealed System Design and Components

Sealed System Safety and Installation

Covers safety valve, pressure gauge, expansion vessel, and filling point requirements.

Site Requirements and Compartment Ventilation

Site Clearances, Gas and Electrical Supply

Condensate Drain Installation Guidelines

Condensate Pipework Requirements

Specifies pipe material, diameter, fall, support, and length for condensate drains.

Flue Terminal Positioning and Guards

Horizontal Flue System Options

Vertical and Twin Flue System Options

Plume Displacement Kit Installation

Plume Displacement Kit Fitting Instructions

Details how to install the kit to manage condensate plume nuisance.

Plume Displacement Permissible Lengths

Boiler Installation and Wall Plate Fixing

Wall Plate and Flue Hole Installation

Details marking and cutting holes for the wall plate and flue.

Boiler Mounting and Connections

Fitting the Boiler to the Wall Plate

Guides on how to mount the boiler onto the prepared wall plate.

Making Water and Condensate Connections

Details how to connect water pipes and the condensate drain.

Gas Connection and Flue Fitting

Fitting the Horizontal Flue

Step-by-step guide for installing the horizontal flue system.

Electrical Connections and PCB Configuration

Making Electrical Connections

Details how to connect incoming electrical cables to the terminal block.

Electrical Wiring Diagrams

Boiler Commissioning Procedures

Commissioning Steps and Checks

Outlines the essential steps for commissioning the boiler, including system checks.

Checking Gas Inlet Pressure and Rate

Operational Gas Inlet Pressure Check

Details how to check the working gas inlet pressure at maximum load.

Measuring Gas Rate

Explains how to measure the gas rate with other appliances turned off.

Fitting the Outer Case and User Handover

Annual Boiler Servicing Guidelines

Routine Annual Servicing Requirements

Recommends annual servicing by a competent person and lists checks.

Combustion Performance Checking

Specifies how to check CO/CO2 ratio and the required competence for analysis.

Annual Servicing Inspection Procedures

Pre-Service Safety Checks

Emphasizes isolating supplies and checking component seals before servicing.

Inspection of Internal Components

Details visual checks and cleaning of parts like the burner, heat exchanger, and seals.

Cleaning Heat Exchanger and Burner

Changing Boiler Components

Component Replacement Safety Precautions

Stresses isolating gas and electrical supplies before changing parts.

Fault Finding Diagnostic Flowcharts

Electrical Supply Fault Finding

Dry-Fire Fault Finding

Ignition Lockout Fault Finding

Overheat Lockout Fault Finding

Fan Lockout and Thermistor Fault Finding

Related product manuals