EasyManua.ls Logo

BeiJer X2 base 7 - Installation Process Steps

BeiJer X2 base 7
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
In stallation
2.2 InstallationProcess
1.
Unpack and check the delivery. If damage is found, notify the supplier.
2.
Place the operator panel on a stable surf ace during installation. Dropping the
operator panel or letting it fall may cause damage.
3.
To cut a correct opening for the operator panel, use the cut out dimensi ons
in the outline drawing. A separate cut out drawing is available for download
from the Beijer Electronics web site. For more information, see sections
Operator Panel Drawings and Technical Data.
4.
Secure the operator panel in position using all the fastening holes and the
provided brackets and screws:
32
0.4 ~ 0.7 Nm
1
BeijerElectronics, MAEN181B
7