EasyManua.ls Logo

Belling XOU60G - Page 56

Belling XOU60G
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing Your Cooker 53
Commissioning 700 & 900 size appliances (Stoves 700GDO, 900GDO &
Belling XOU70G, XOU90G)
Pressure test point
Use the oven burner. From inside the oven remove the burner cowl. Remove the small
screw at the LHS of the burner cradle. Slide the burner to the left to access the injector.
Connect manometer to the injector and turn the grill burner to full on to check pressure.
Replace in reverse order.
Burner aeration
All burners have fixed aeration and no adjustment is possible.
Pressure setting
G20 Natural Gas @ 20 mbar
Electrical systems check
In the event of an electrical fault the preliminary electrical system check (earth continuity,
short circuit, polarity and resistance to earth) must be carried out.
Ignition
The automatic ignition continues to spark for a short time after the burner has lit until the
flame is established.
Ovens (Top and Main)
1. Push in and turn the control knob to Gas Mark 9. The oven burner/ignition/light/cooling
fan will come on automatically.
2. Adjust to the required setting.
3. The burner may not come on to a full rate unless the oven door is closed.
The oven burner operates at a low rate for up to 60 seconds until the flame supervi-
sion device opens and full gas rate is obtained.
Grill
1. Open the door, push in and turn the control knob anticlockwise to the full on setting.
2. Check condition of flame.
When you first turn on the oven or grill you may notice a smell and some smoke which
comes from the protective coating of oil burning off from some of the parts.
Before leaving the installation
Show the customer how to ignite the oven and grill, and give them this handbook. Thank
you.

Related product manuals