12.0 Completion
© Baxi Heating UK Ltd 2007
12.1 Completion
1. Hinge the facia panel upwards and refit the case front
panel. Tighten the securing screws (Fig. 51).
2. Instruct the user in the operation of the boiler and system,
explaining the operational sequence.
3. Carefully read and complete all sections of the Benchmark
Commissioning Checklist at the rear of this publication that
are relevant to the appliance and installation. These details
will be required in the event of any warranty work. The
publication must be handed to the user for safe keeping and
each subsequent regular service visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and Servicing
Instructions, giving advice on the necessity of regular
servicing.
Fig. 51
Facia Panel
Case Front Panel

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Benchmark MAIN and is the answer not in the manual?

Benchmark MAIN Specifications

General IconGeneral
BrandBenchmark
ModelMAIN
CategoryBoiler
LanguageEnglish

Related product manuals