p.11
Using the ratchet, 8 inch
extension and 3/4 inch socket,
fasten the rail to the front end
of the machine. This will take
all four 3/4 inch bolts that
were removed in step 5 of the dismantling
process. You may now remove the supports
propping up the length of the rail.
The rail should now be completely attached and secured
to the rest of the machine.
Step 4: Working on the front of
the machine now, take the beak
and attach it to the front face
using the ratchet and 3/4 inch
bolts provided.
(The part catcher must be
removed from the beak in order
to place the beak inside of the
beak slot on the head of the
machine. Place the 1/2 inch