4.0
Commissioning
Note
It
is a
requirement
that
only
suitably qualified
and
competent
personnel
are allowed to
undertake
the
commissioning
of the heater.
It
is also strongly
recommended
that
prior
to
commissioning
the
engineer
familiarises
himself
\vith
the
information
contained
within
the
information
pack
that
accompanies
the
heater,
the
heater
itself,
and
with
the
specific
requirements
of
the
installation/
application. The following checks
should
be carried
out
after the familiarisation process.
Warning
All
Cabinet
Heaters
undergo
a
rigorous
test
programme
prior
to
being
dispatched,
whilst
such
a
programme
does
involve
pre-commissioning
and
setting
up
the
heater
to
operate
efficiently
and
well
within
its
designed
operational
limits, this
does
not
mean
that
on
site
commissioning
is less
important
than
might
otherwise
be
the case. The idiosyncrasies of
each
installation
can
only
ever
be
allowed
for,
through
the
use
of
thorough
on
site
commissioning
carried
out
by
trained
and
experienced
personnel
equipped
\"'ith
the
correct tools
and
apparatus.
Note
It
is
strongly
recommended
that
equipment
used
for the
sampling
and
an
alysis
of
flue gases is
accurate
to
within
+/-
0.5%
and
maintained
so
that
it is
regularl
y calibrated.
Fig 13 -
Heater
Control
Panel
wARNING
ISOLATE MAINS BEFORE REMOVING COVER
OFF VENTILATE MANUAL
gg~
ON HEAT AUTOMATIC
Fig 14 -
Time
Clock
Controls
Reset Button
Manual Switch Summer
and
Winter Time Setting
Enter Switching
Times
Input Times
Enter Weekday { s
Enter the Hours
Weekdays fiash
Enter minutes
18