EasyManua.ls Logo

Beretta Power X 35 User Manual

Beretta Power X 35
276 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Manuale Installatore
Installation Manual
Notice installateur
Manual del Instalador
Manual do Instalador
Instrukcja instalatora
Manual pentru instalator
Telepítői kézikönyv
CONDENSING
POWER X 35 - 50 - 50 DEP
Installation Manual
IT
EN
FR
ES
PT
HU
RO
PL

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Beretta Power X 35 and is the answer not in the manual?

Beretta Power X 35 Specifications

General IconGeneral
TypeCondensing
Max. Heating Output35 kW
NOx class5
Warranty2 years
Gas TypeNatural Gas
Hot Water ProductionInstantaneous
EfficiencyUp to 98% (based on LHV)
Dimensions700 x 400 x 300 mm

Summary

Safety Warnings and Precautions

General Safety Information

Essential safety guidelines for boiler installation and operation, including user instructions.

Operational Safety Precautions

Key safety measures to follow during operation, including gas leak procedures and environmental disposal.

Appliance Description

Appliance Overview and Features

Overview of the POWER X boiler, its operating scenarios, technical features, and safety devices.

Functional Elements of the Boiler

Boiler Dimensions and Connections

Water Circuit Diagram

Control Panel Interface

Technical Specifications and Data

Pump Functionality

Electrical Wiring Diagrams

Cascade System Wiring

Installation Procedures

Installation Standards and Requirements

Reference standards, local regulations, and requirements for proper boiler installation.

Boiler Positioning and Ventilation

System Preparation and Cleaning

Hydraulic Connections and Mounting

Outdoor Sensor Installation Guide

Electrical and Gas Connections

Hydraulic Diagrams and Kits

Boiler Frame and Bracket Kits

System Shut-off and Storage Tank Kits

Heating-Only System Water Scheme

HT System with Storage Tank Scheme

HT+LT System with Storage Tank Scheme

Combustion Product Evacuation

Forced Open Installation (Type B23P-B53P)

Details for forced open installation, including flue gas discharge pipe requirements and air intake.

Airtight Installation (Type C)

Flue Pipe Configurations and Limits

Using Old Flue Pipes

Condensate Drain Preparation

Filling and Emptying the Heating System

Ignition and Operation

Preliminary Operations and Boiler Control

Steps before ignition, turning the boiler on/off, and understanding operating modes.

Temperature Settings: Hot Water and Heating

External Climate Control Adjustment

Boiler Monitoring and Status Indicators

Monitor Function and Error Message Interpretation

Boiler Adjustments and CO2 Calibration

Gas Type Transformation (Methane-LPG)

Maintenance Procedures

Routine and Extraordinary Maintenance

Overview of periodic maintenance tasks, including routine checks and extraordinary repairs.

Checking Combustion Parameters

Procedure for analyzing flue gas parameters and calibrating the boiler for optimal combustion.

Related product manuals