2 Installation
2.1 Pre-requisites
The building work has to be completed to a point where no more big dust producing work needs to
be done.
l Floor, ceiling and walls finished.
l If needed, wall cuts have to be finished and measurements checked.
l Electrical and network cabling finished and ready to use.
l If the System is not connected to a standard outlet, the connection from the Power
Distribution Unit (PDU) to the house-installation has to be done by a certified electrician.
l bibliotheca does not recommend connecting the PDU to a standard outlet as the
system can be accidentally unplugged. Where possible, always use a fixed connection.
l A layout of the system, including device numbers has to be present.