En
- 8 - Rev. 1
Maintenance
In the event of failures, defects and suspected defects, or
when the machine drops, immediately unplug the machine
from the power outlet. Never start a defective machine
Only Authorized Service Centers or the manufacturer can
repair the machine.
Disposal
The WEEE Directive (Waste Electrical and
Electronic Equipment) requires the disposal of
electrical and electronic products separate
from ordinary domestic waste and equivalent.
The purpose is to send the waste to authorized
disposal plants, in order to promote possible
forms of recovery or recycling.
The Directive covers also accessories, power
cords, etc.
To dispose of such products, please follow the guidance from the
municipal authority and / or request more information from your
dealer when purchasing a new product.
En
- 9 - Rev. 1
First Start – Start after a long time
Fill the hydraulic circuit first.
Hook the filter holder to the coffee group and place a bowl on the
grid.
Switch on the machine by pressing the main switch.
If the water in the tank is enough, the boiler will start loading. Open
the steam knob () and keep it open until the boiler is full.
If the loading has been completed, the boiler starts heating. The
light on the frontal panel will signal it.
Move down the coffee lever and keep it down until 150 ml of water
is dispensed.
Note: If loading is not completed in a given time, it will be
automatically stopped. Check the water level, switch off the
machine and turn it on again.
Wait for the correct temperature. In a few minutes the manometer
will start indicating the rising pressure. When the temperature is
reached (manometer pointer is between 1.1 – 1.4 Bar), the light on
the frontal panel switches off.
WARNING: Be careful when handle the machine parts.
The filter holder, the coffee group, the steam wand
and the hot water wand could reach high
temperatures: RISK OF BURNS!
Once the boiler reaches the operating temperature, open the steam
knob and let the steam flow for at least 30 seconds. Put a bowl on
the grid and dispense 30 seconds of hot water with the water wand.
Finally, dispense 30 seconds of water from the coffee group.
The machine is ready
Note: When the temperature in the boiler is too low, the heating
starts again. LED light switches on.