EasyManua.ls Logo

BIG TREE TECH Pad7 - Core Board Replacement Procedure; Replacing CB1 with CM4

BIG TREE TECH Pad7
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shenzhen Big Tree Technology Co., Ltd.
BIGTREETECH
8 / 17
To Replace CB1 with CM4
1. Disconnect the power, and place the Pad7 backside up on the table;
2. Remove the two M2.5 x 3 flat head countersunk screws with a 1.5 mm hex
screwdriver counterclockwise.
Then slide the bottom cover up with your fingers.
3. Remove the four M2.5 x 10 socket head cap screws with a 2.0 mm hex
screwdriver counterclockwise.
Then remove the heatsink.