EasyManua.ls Logo

Binder redLINE RE 53 - User Manual

Binder redLINE RE 53
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Issue 12/2010 Art. No. 7001-0201
Operating Manual
redLINE RE
Gravity Convection Oven
Model Art. no.
RE 53 (230 V) 9090-0001, 9190-0001
RE 53-UL (100-120 V) 9090-0002, 9190-0002
RE 115 (230 V) 9090-0007, 9190-0007
RE 115-UL (100-120 V)
9090-0008, 9190-0008
redLINE RF
Mechanical Convection Oven
Model Art. no.
RF 53 (230 V) 9090-0003, 9190-0003
RF 53-UL (100-120 V) 9090-0004, 9190-0004
RF 115 (230 V) 9090-0009, 9190-0009
RF 115-UL (100-120 V)
9090-0010, 9190-0010
redLINE RI
Incubator
Model Art. no.
RI 53 (230 V) 9090-0005, 9190-0005
RI 53-UL (100-120 V) 9090-0006, 9190-0006
RI 115 (230 V) 9090-0011, 9190-0011
RI 115-UL (100-120 V)
9090-0012, 9190-0012
www.binder-redline.com

Table of Contents

Questions and Answers

Summary

Safety

Legal Considerations

Information for installing, start-up, operation and maintenance of the unit.

Safety Instruction Structure

Details the structure of safety instructions, including symbols and warnings.

Unit Safety Labels

Identifies the location and types of safety labels on the unit.

Type Plate Details

Details the information provided on the unit's type plate.

General Installation & Operation Safety

Crucial safety guidelines for installation and operation of the chambers.

Intended Use and Limitations

Specifies the approved applications and limitations of the redLINE chambers.

Unit Description

Unit Scope of Delivery

Lists the items included with the redLINE chamber upon delivery.

Unit Equipment Overview

Provides a visual and labeled overview of the chamber's main components.

Control Panel Overview

Describes the location and function of the control panel.

Scope of Delivery, Transportation, Storage, and Installation

Unpacking and Checking Unit

Instructions for unpacking and verifying the contents and condition of the unit.

Safe Lifting and Transportation

Procedures and precautions for safely handling and moving the equipment.

Unit Storage Guidelines

Recommendations for storing the unit in a safe and suitable environment.

Installation Location & Conditions

Specifies ideal installation sites and environmental parameters for operation.

Chamber Stacking Guidelines

Guidelines for safely stacking multiple redLINE chambers.

Installation of the Equipment

Equipment Electrical Connection

Details on connecting the unit to the power supply.

Optional Suction Plant Connection

Instructions for optional connection to a suction system.

Start Up

Air Change Adjustment

How to adjust the air circulation within the chamber.

Controller Overview

Explanation of the controller's display and buttons.

Powering On the Unit

Step-by-step guide to powering on the chamber.

Operating the Controller

Controller Operational Modes

Describes the different operational modes of the controller.

Automatic Mode Set-Point Entry

How to set the desired temperature in Automatic Mode.

Manual Mode Operation

How to manually control the heating power.

Timer Operation

Using the timer function for timed operation.

Temperature Unit Selection

How to change the temperature display unit (°C or °F).

Calibrating and Adjusting the Temperature Controller

Calibration Equipment Requirements

Lists the necessary equipment for calibration.

Temperature Accuracy Check

Procedure for checking the temperature controller's accuracy.

Two-Point Calibration Procedure

Step-by-step guide for adjusting the controller's calibration.

Cleaning and Decontamination

Chamber Cleaning Procedures

Instructions and agents for cleaning the chamber.

Decontamination Procedures

Procedures for decontaminating the chamber after hazardous material use.

Unit Decommissioning

Maintenance

Maintenance Schedule

Schedule for routine maintenance tasks.

Technical Service Information

Disposal

Transport Packing Disposal

Guidelines for recycling or disposing of packaging materials.

EC Member State Disposal

Procedures for disposing of units within the EU, adhering to WEEE.

Non-EC Member State Disposal

Procedures for disposal outside the EU.

Troubleshooting Guide

Technical Description

Factory Calibration Process

Information on the factory calibration process.

Over Current Protection

Details on the unit's over current protection mechanism.

Usable Volume Definition

Explanation and calculation of the chamber's usable internal volume.

Technical Data Specifications

Comprehensive technical specifications for the redLINE models.

Standard Equipment

Lists the standard equipment included with the redLINE chambers.

Summary

Safety

Legal Considerations

Information for installing, start-up, operation and maintenance of the unit.

Safety Instruction Structure

Details the structure of safety instructions, including symbols and warnings.

Unit Safety Labels

Identifies the location and types of safety labels on the unit.

Type Plate Details

Details the information provided on the unit's type plate.

General Installation & Operation Safety

Crucial safety guidelines for installation and operation of the chambers.

Intended Use and Limitations

Specifies the approved applications and limitations of the redLINE chambers.

Unit Description

Unit Scope of Delivery

Lists the items included with the redLINE chamber upon delivery.

Unit Equipment Overview

Provides a visual and labeled overview of the chamber's main components.

Control Panel Overview

Describes the location and function of the control panel.

Scope of Delivery, Transportation, Storage, and Installation

Unpacking and Checking Unit

Instructions for unpacking and verifying the contents and condition of the unit.

Safe Lifting and Transportation

Procedures and precautions for safely handling and moving the equipment.

Unit Storage Guidelines

Recommendations for storing the unit in a safe and suitable environment.

Installation Location & Conditions

Specifies ideal installation sites and environmental parameters for operation.

Chamber Stacking Guidelines

Guidelines for safely stacking multiple redLINE chambers.

Installation of the Equipment

Equipment Electrical Connection

Details on connecting the unit to the power supply.

Optional Suction Plant Connection

Instructions for optional connection to a suction system.

Start Up

Air Change Adjustment

How to adjust the air circulation within the chamber.

Controller Overview

Explanation of the controller's display and buttons.

Powering On the Unit

Step-by-step guide to powering on the chamber.

Operating the Controller

Controller Operational Modes

Describes the different operational modes of the controller.

Automatic Mode Set-Point Entry

How to set the desired temperature in Automatic Mode.

Manual Mode Operation

How to manually control the heating power.

Timer Operation

Using the timer function for timed operation.

Temperature Unit Selection

How to change the temperature display unit (°C or °F).

Calibrating and Adjusting the Temperature Controller

Calibration Equipment Requirements

Lists the necessary equipment for calibration.

Temperature Accuracy Check

Procedure for checking the temperature controller's accuracy.

Two-Point Calibration Procedure

Step-by-step guide for adjusting the controller's calibration.

Cleaning and Decontamination

Chamber Cleaning Procedures

Instructions and agents for cleaning the chamber.

Decontamination Procedures

Procedures for decontaminating the chamber after hazardous material use.

Unit Decommissioning

Maintenance

Maintenance Schedule

Schedule for routine maintenance tasks.

Technical Service Information

Disposal

Transport Packing Disposal

Guidelines for recycling or disposing of packaging materials.

EC Member State Disposal

Procedures for disposing of units within the EU, adhering to WEEE.

Non-EC Member State Disposal

Procedures for disposal outside the EU.

Troubleshooting Guide

Technical Description

Factory Calibration Process

Information on the factory calibration process.

Over Current Protection

Details on the unit's over current protection mechanism.

Usable Volume Definition

Explanation and calculation of the chamber's usable internal volume.

Technical Data Specifications

Comprehensive technical specifications for the redLINE models.

Standard Equipment

Lists the standard equipment included with the redLINE chambers.

Binder redLINE RE 53 Specifications

General IconGeneral
BrandBinder
ModelredLINE RE 53
CategoryConvection Oven
LanguageEnglish

Related product manuals