EasyManua.ls Logo

BIO-MICROBICS MicroFAST 4.5 - Layout; Location

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
LAYOUT
LOCATION
Always have all utility lines and equipment marked by a locating service prior to performing any work.
Failure to do so could result in severe bodily injury or death.
FAST® systems may be located in the same position relative to a structure and water supply as any
conventional septic system. However, some basic guidelines should be followed:
1. The FAST® system must be located so that sufficient slope (≥2%, ¼ in/ft) is provided for the influent
and effluent lines.
2. Excessive back pressure must not be applied to the blower. Follow all installation guidelines.
3. The method and arrangement for effluent discharge must not interfere with the treatment plant’s
operation.
FAST® UNIT
INFLUENT
WASTE
INSPECTION/PUMP
OUT PORT
BLOWER
SaniTEE®
VENT PIPE
CONTROL
PANEL
EFFLUENT
PIPE

Related product manuals