5
Persons coming in contact with wastewater must immediately wash all exposed areas and contact
their personal physician. Failure to do so could result in severe sickness or death.
Hazards exist in confined spaces such as a septic tank. All confined space precautions must be followed
if entering a tank. Always keep tank openings covered during storage and installation.
NON-SUPPLIED TOOLS AND MATERIALS
NOTE: Other tools may be required to complete installation
1. Septic tank that meets all applicable
requirements and standards
2. Safe lifting mechanism to move the FAST®
unit
3. Anchor wedges (stainless steel) for securing
FAST® unit to the tank and blower housing
to the base
4. Piping for observation/vent port, air lines,
vent lines and leg extensions
5. PVC pipe saw
6. Pipe lubricant/soap
7. PVC primer and glue
8. Base for blower assembly
9. Mounting screws for control panel
10. Electrical conduit, fittings, and specified
wires
11. Hammer drill and masonry bits
12. 3” galvanized or metal pipe for air supply
line
DETAILS OF FAST SUB-ASSEMBLIES
FAST® Model Unit Dimension
W X H X L
SUB-ASSEMBLY
WITH FEET
NUMBER OF FEET
MicroFAST 4.5
82 X 52 X 156 in
[209 x 132 x 396 cm]
550 lbs
[250 kg]
13
MicroFAST 9.0
82 X 76 X 156 in
[209 x 193 x 396 cm]
880 lbs
[400 kg]
13
MyFAST 1.0
82 X 88 X 156 in
[209 x 224 x 396 cm]
1220 lbs
[554 kg]
15