EasyManua.ls Logo

Biosan DEN-1 - Operation; Recommendations During Operation

Biosan DEN-1
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
5. Operation
5.1. Recommendations during operation.
Remove the tube with the solution from the socket before switching the unit on or off.
We recommended keeping the unit switched on for 15 minutes before starting the
operation in order to stabilize it in the working mode.
If flat-bottomed tubes are used, the solution level should be higher than 7 mm from a
tube bottom; if round-bottomed tubes are used - higher than 12 mm from a tube bot-
tom.
Check if the A-16 adapter is in the socket (fig. 2/1). The device is calibrated for oper-
ation with the glass tubes 16 mm in external diameter. To use different tubes, recali-
brate the unit, see the Calibration section of the manual.
Figure 2. Front view
Figure 3. Back view

Other manuals for Biosan DEN-1

Related product manuals