EasyManua.ls Logo

Bizerba P220901037 - Page 392

Bizerba P220901037
505 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Instruction manual GLM-I
390 38.019.129.001 en
28
Activity Interval Cleaning agent/
lubricant
Rotary arm labeler Labeling chute: Spray soiling
with sufficient label remover
.
Leave it to soak in well and re-
move the label residues by
hand or with a cloth.
0.5 days Label remover,
95943000000
Clean and lubricate roller
track.
0.5 days Label remover,
95943000000
Oil, 96001740000
Rotary arm labeler Replace rotary arm labeler. 2 weeks –
Piston labeler Clean suction plate, gripper. Daily Label remover,
95943000000
Turn suction piston. 2 weeks –
Belt labeler Replace pressure roller. 4 weeks –
Clean deflecting plate, suction
plate, gripper.
0.5 days Label remover,
95943000000
Belt labeler Clean jet. If dirty Label remover,
95943000000
Belt modules
Activity Interval Cleaning agent/lu-
bricant
Clean, replace belt. After soiling/wear
and tear
Water with standard
cleaning agents
Papst-Zeitlauf, Maxon: Replace motors. 1.25 years –
Check conveyor rollers and replace, if nec-
essary.
With each belt re-
placement
–
Clean belt bodies: With each belt re-
placement
Brush and label re-
mover, 95943000000

Table of Contents