- 4 -
GENERAL INFORMATION
Read instructions thoroughly prior to assembly and installation.
All Bloom products are factory adjusted for optimal nanobubble production. Do not
adjust factory setpoints.
LOCATION REQUIREMENTS
Carefully select the BLOOM installation location based on the requirements specified in this
section. Locate and secure the BLOOM on a concrete pad or other firm, level surface that is
at least 44 in long x 23 inches wide. Maintain a clearance of at least 30 inches on all sides to
allow access for servicing and maintenance to the front and back of the BLOOM. Select a
sheltered, (weatherproof), well-ventilated area that is protected from excess moisture (i.e.,
rain, splashing, washdown water, etc.), dust and flooding. Use the schematic shown in
Figure 1 for mounting hole placement.
Figure 1. Plan view of BLOOM frame showing mounting hole placement.
The BLOOM power, suction and discharge pipe requirements are summarized in Table 1 and
Table 4 respectively.
Failure to install BLOOM within the limits specified in Tables 1 and 4 may void the
system warranty and result in poor nanobubbles production and pump cavitation.