EasyManua.ls Logo

Blue Lagoon BL220 User Manual

Blue Lagoon BL220
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
UV-C and Pool equipment
BL220
PERISTALTIC
PUMP
WITH BUILTIN
PH/RX METER
www.bluelagoonuvc.com
MEMBER OF:
Question and Answer IconNeed help?

Do you have a question about the Blue Lagoon BL220 and is the answer not in the manual?

Blue Lagoon BL220 Specifications

General IconGeneral
BrandBlue Lagoon
ModelBL220
CategoryWater Pump
LanguageEnglish

Summary

Safety and Handling Guidelines

General Warnings

Manual is for technical personnel; ensure electrical and hydraulic insulation before maintenance.

Shipping Procedures

Process for returning the pump for repair or calibration, including required documentation.

Operational Safety Tips

Key safety advice for pump operation, maintenance, and personnel handling.

Product Overview and Operation

Packing List

List of items included with the pump upon delivery.

Technical Specifications

Detailed technical data including flow rate, materials, dimensions, power, and measurement ranges.

Principle of Operations

Explanation of how the peristaltic pump works and its measurement system.

Installation Instructions

Guidance on correctly mounting and positioning the pump in a dry area.

Hydraulic Connections

Suction Line Setup

Step-by-step guide for connecting the suction tube, including foot filter placement.

Injection Line Setup

Instructions for connecting the injection tube and valve at the pipeline.

Electrical Connections

Control Panel Overview

Configuration Process

Parameter Definitions

Calibration Procedures

pH Calibration

Step-by-step guide for calibrating the pH electrode using buffer solutions.

Redox Calibration

Procedure for calibrating the redox electrode, focusing on offset adjustment.

Maintenance

Weekly Maintenance

Tasks to perform weekly, including checking liquid level, tubes, and filter clogging.

Periodic Maintenance

Tasks for every three months, focusing on cleaning parts exposed to chemicals.

Replacing the Fuse

Procedure for replacing the pump's fuse, emphasizing qualified personnel for this task.

Replacing the Peristaltic Tube

Step-by-step guide for replacing the pump's internal peristaltic tube.

Pump Wintering

Procedure for preparing the pump for storage at the end of the season or for long periods.

Troubleshooting Guide

Accessories and Spare Parts

Warranty Conditions

Recycle Information