Installation
The unit must be installed by a competent person, on a firm level surface capable of supporting the
weight of the machine when the bath is filled, and all connections made.
Ensure that the ventilation openings are not blocked to allow free movement of air through
the unit. Failure to do this will seriously affect the reliability of the fridge, invalidate
the warranty and shorten the life of the fridge system.
The water bath requires filling prior to switch on. Fill the bath using cold water through the
opening on the top of the machine until water is displaced from the overflow. Discontinue
filling and replace the overflow cap.