B4.2 Install & Operation ManualBorg & Overström AU7
Operation
4
Water Connection & Operation
All hot & sparkling tanks must
be purged of air by holding the
corresponding button. Do not
switch the hot system on until
tank has been purged.
4
The relevant indicator lights will
be lit.
6
Connect and turn on the water
supply. Then connect the power
supply.
1
Press and hold the cold water
button until water comes out.
3
On sparkling models turn on the
carbonation switch on the back
of the unit.
5
To avoid damage do not turn on
the cold or hot power switches
until water ows out of the
machine. (If applicable)
2
NOTE: Water supply to the product must be within 1.5 - 3.5 bar.
A pressure limiting valve and dual check valve in accordance with
AS/NZS 3500.1 & AS/NZS 3500.2 must be used for all incoming
water supplies. This is included in Part No. 461263 - AU Installation Kit.
If the product is installed where the mains water pressure is less than 1.5 bar
then a pressure boost pump must be installed prior to the water inlet bulkhead.
Failure to comply with this will invalidate your warranty.