B400R 1-3kVA User Manual
4
1.1.1 Inspection of Unit
Inspect the UPS upon arrival. If the UPS is apparently damaged during shipment, please keep the
box and packaging material in its original form for the courier and notify the Borri immediately.
1.1.2 Unpacking the Cabinet
To unpack the system:
1. Open the outer carton and remove the accessories packaged with the cabinet.
2. Carefully lift the cabinet out of the outer carton and set it on a flat, stable surface.
3. Discard or recycle the packaging in a responsible manner, or store it for future use.
1.1.3 UPS Setup
All models of the B400R series are designed for tower and rack purpose. They can be installed into a
19 inch equipment rack or installed within a provided stand as a tower. Please follow the below
instruction for Tower or Rack-Mount Setup.
Tower setup
The B400R Series can be installed horizontally and vertically. As a tower configuration, it is provided
with optional UPS stands to stabilize the UPS. The UPS stand must be attached to the bottom of the
tower. Use the following procedure to install the UPS within the stands.
1. Position the UPS stands appropriately so that 1 stand will be at either end of the UPS.
2. Lift and carefully place down the UPS within the stands.
3. Pull out the LCD box carefully and rotate it in a clockwise direction by 90 degrees and then place it
back in the front panel.
Illustrations are shown on the page below.