Home
Bosch
Control Panel
D9412GV2
Page 90
Bosch D9412GV2 - Page 90
104 pages
Manual
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
© 2007 Bosch Security Systems, Inc.
130 Perinton Parkway
, Fairport, New Y
ork, USA
14450-9199
Customer Service: (800) 289-0096; T
echnical Support: (888) 886-6189
01/07
DS1
101i/1
102i/1
108i Installation Instructions
P/N: 26227-01 Page 4
89
91
Table of Contents
Main Page
English
4
Default Chapter
2
Listings and Approvals
2
Table of Contents
4
1 Introduction
7
Related Documentation
7
2 Lightning Strikes
8
Effects
8
Precautions During Installation
8
3 Overview
9
Configuration and Parts
9
Figure 1: System Configuration
9
GV2 Series Control Panel Differences
9
Parts List
10
Parts Available by Separate Order
10
Accessories
10
Table 17: Table
10
The D9412GV2
10
Compatible Accessories
10
SDI Molex Connector
11
Tip and Ring Posts
11
Super Capacitor
11
Telephone Line Sniff
12
Points
12
Areas and Accounts
12
Digital Communicator
12
Keypads
13
Keyswitch
13
Access Control
13
Event Memory
13
D6500 MPU and Line Cards
13
Centers
13
Event Log
14
Ground Fault Detection
14
Ground Fault Detection Added Feature
14
Conettix Functions
14
Programming
14
Other Features
14
4 Installation
15
Installation Preparation
15
Enclosure Options
15
Mounting Enclosure
15
Figure 2: Enclosure Mounting
15
Installing the Control Panel
16
Connecting Earth Ground
16
Terminal 10
16
Ground Fault Detect Enable
16
Figure 3: Ground Fault Detection
16
Enabling Ground Fault Detection
17
D7212GV2 Ground Fault Specifications
17
Figure 4: Ground Fault Detect (S4)
17
Figure 5: Area 5 Silent Alarm Relay in RPS
17
Ground Fault Impedance Specifications
17
Locking the Reset Pin
18
Completing the Installation
18
Charging the Battery
18
Installing and Wiring Detection Devices
18
Figure 6: Reset Pin
18
Installing Modules and Relays
19
Connecting the On-Board Points and Keypads
19
Powering up
19
Programming the Control Panel
19
Installing the Point Chart Label
19
Testing the System
19
Service Walk Test
20
Figure 7: D9412GV2 Service Walk Test Flow Chart
21
Chart
21
Figure 8: D7412GV2 Service Walk Test Flow Chart
22
Chart
22
5 Power Supply
23
Primary Power Terminals 1 and 2
23
Primary (AC) Power Circuit
23
Installing the Transformer
23
Secondary Power Terminals
23
Secondary (DC) Power
23
Installing the Battery
24
Figure 9: Non-Power-Limited Wiring
25
Replacing the Battery
26
Battery Supervision
26
Battery Charging Circuit
26
Figure 10: Charging and Battery Leds
26
Battery Discharge and Recharge Schedule
27
Charging Status and Low Battery Leds
27
6 Power Outputs
28
Circuit Protection
28
Total Available Power
28
Continuous Power Output Terminals 3, 8, 24, and 32
28
Programmable Power Output Terminals 6, 7, and 8
28
Programming
28
Terminals 6 and 7
29
Fire System Power Formula
29
Terminal 8
29
7 Telephone Connections
30
Registration
30
Notification
30
Location
30
Telephone Cord Connection
30
Figure 11: RJ31X Wiring
30
Operation Monitor LED Locations
30
Phone LED (Red)
31
Operation Monitor LED (Green)
31
Dialing Format
31
Telephone Line Monitor
31
Called Party Disconnect
31
Communication Failure
31
D928 Dual Phone Line Switcher
32
Description
32
Operation
32
Installing the D928
33
D928 Status Leds
33
Figure 13: D928 Dual Phone Line Switcher
33
Phone Cord Lengths
33
8 On-Board Points
35
Terminals 11 to 22 Description
35
Point Sensor Loops
35
Point Parameters
35
Figure 14: On-Board Point Sensor Loop Wiring
35
Point Response Time
36
Wiring Information for Installations Using the Rothenbuhler 5110/4001-42 High Security Bell
36
Security Bell Wiring Configuration
37
Figure 16: Wiring the Rothenbuhler 5110/4001-42
38
High Security Bell to the D9412GV2 or D7412GV2 Control Panel
38
9 Off-Board Points
39
Point (Zonex) Bus: D9412GV2 Terminals and D7412GV2 Terminals
39
POPIT Modules
39
POPEX Modules
39
Missing Conditions
39
Extra Point Events
39
D9412GV2/D7412GV2 Responses to Missing Point Conditions
40
D8125, D8127 and D9127 POPIT Modules
40
Off-Board Point Errors
40
Figure 17: Connecting the D8125 POPEX to the D9412GV2 Control Panel
41
Figure 18: Connecting the D8125 POPEX to the D7412GV2 Control Panel
42
Installing the D8125 POPEX Module
43
Mounting
43
Wiring the D8125 to the Control Panel
43
Wiring Popits to the Data Expansion Loop
43
Specifications
43
Wiring Data Expansion Loops to POPEX Modules
44
POPIT Sensor Loops
44
POPIT Module Point Assignments
44
Program Record Sheet
44
POPIT Labels
45
D8128D Octopopit Module
45
Description
45
Figure 19: Program Record Sheet
45
Listings
46
Figure 20: D8128D Octopopit Layout
46
Installation
47
Setting the Octopopit Switches
47
D8128D Octopopit Switch Settings for D9412GV2 and D7412GV2
47
Switch 5 Settings for Line Termination
47
Mounting Octopopits
48
Wiring Octopopits
48
Terminal Strip Connections
48
Figure 21: Connecting D8128D Octopopits to the D9412GV2
49
Figure 22: Connecting D8128D Octopopits to the D7412GV2
50
Octopopit Sensor Loops
51
Figure 23: Wiring Multiple D8128Ds Using
51
Testing Off-Board Points
52
Figure 24: D8128D Octopopit Sensor Loops
52
10 Off-Board Relays
53
D8129 Octorelay
53
Figure 25: D8129 Connections to the D9412GV2
53
Configuring the D8129 Octorelay
54
Relay Outputs
54
Installation
54
Figure 26: D8129 Connections to the D7412GV2
54
D8129 Octorelay Switch Settings
54
Wiring Connections
55
D811 Arm Status Relay Module
55
Relay Output
55
Number of D8128Ds Used with D8129S
55
Installation
56
Wiring Connections
56
Figure 27: D811 Module Wiring to the D9412GV2
56
Figure 28: D811 Module Wiring to the
57
D7412Gv2
57
11 Arming Devices
58
Description
58
Keypad Terminals 29 to 32
58
Assigning an Address for the Keypad
58
Keypad Address Settings
58
Installation
59
Keypad Connections
59
D279A Independent Zone Control
60
Keyswitch
60
Description
60
Programming
60
Installation
60
Operation
60
Figure 29: Power at Keypads
60
Figure 30: Keyswitch Wiring
61
12 SDI Devices
62
Description
62
Installation
62
D9131A Parallel Printer Interface Module
62
Switch Settings
62
Supervision
62
SDI Device Connections
62
Printer Address Switch Settings
62
D9210B Wiegand Control Interface Module
63
Access
63
Switch Settings
63
SDI Address 80
63
Serial Interface Modules (Sims)
63
Address Settings
63
Address Switch Settings for Access Control Module
63
Supervision
64
SDI Address 88
64
D9133DC Direct Connect Programming Module
64
Network Interface Modules
64
Figure 31: D9133 Jumper Setting for Address
64
Figure 32: Dx4010I DIP Switch Settings
64
Address Settings
65
Supervision
65
Figure 33: DX4020 DIP Switch Settings
65
13 Programmer and Accessory Connections
66
Programmer Connector
66
Programmer Access Reports
66
Accessory Connector
66
Figure 34: Reset Pin
66
Figure 35: Programmer and Accessory Connections
66
14 Faceplates
67
D9412GV2 Faceplate
67
Figure 36: D9412GV2 Faceplate
67
D7412GV2 Faceplate
68
Figure 37: D7412GV2 Faceplate
68
Appendix A: System Wiring Diagrams, Issue a
69
D9412GV2 Control Panel
69
Figure 38: D9412GV2, Power Supply Side
69
Figure 39: D9412GV2, Input Points and Peripheral Devices
70
Figure 40: D9412GV2, SDI Devices
71
D7412GV2 Control Panel
72
Figure 41: D7412GV2, Power Supply Side
72
Figure 42: D7412GV2, Input Points and Peripheral Devices
73
Figure 43: D7412GV2, SDI Devices
74
Appendix B: Point Address Charts
75
Zonex 1, Points 9 to 127 (D9412GV2); Zonex 1, Points 9 to 75 (D7412GV2)
75
Zonex 1 Point Address Chart
75
Zonex 2, Points 129 to 247 (D9412GV2 Only)
76
Zonex 2 Point Address Chart
76
Specifications
77
Digital Keypad
81
Français
91
DS9370/DS9371 Tritech
93
DS9370/DS9371 Tritech Ceiling Mount
93
Instructions
93
Installation Considerations
93
Led Operation
93
Walk Test
93
Notice D'installation du Détecteur À Infrarouge Passif/Détecteur D'intrusion À Hyperfréquence DS9370 Tritech Pour Installation Au Plafond
95
DS9370 Tritech-Deckenmelder Passiver Infrarotmelder/Mikrowelleneinbruchsmelder-Installationsanleitungen
96
Technische Daten
96
Istruzioni DI Installazione del Rilevatore a Infrarossi Passivi E del Rilevatore a Microonde Antintrusione con Montaggio a Soffi Tto Tritech DS9370
97
Instruções de Instalação Do Detector contra Intrusos por Microondas/Infravermelhos Passivos DS9370 Tritech Montagem no Tecto
98
Instrucciones de Instalación del Detector de Intrusión por Infrarrojos Pasivos/Microondas Tritech de Montaje de Techo DS9370
99
Installation Instructions
101
Feature Selection
102
Other Information
104
Other manuals for Bosch D9412GV2
Program Entry Guide
148 pages
Troubleshooting Guide
134 pages
User Guide
16 pages
Related product manuals
Bosch D9412GV4
214 pages
Bosch D9412GV3
76 pages
Bosch D9412G
76 pages
Bosch D9112B
96 pages
Bosch D6412
76 pages
Bosch D7024
84 pages
Bosch D7412G
76 pages
Bosch D7412GV4
214 pages
Bosch D7412GV2
104 pages
Bosch D7212GV3
58 pages
Bosch DS7200V2-UK
142 pages
Bosch DS7200V2-EXP
138 pages