56 en | Planning Aspiration smoke detector LSN improved
2020.04 | 6.1 | F.01U.029.275 Operation guide Bosch Sicherheitssysteme GmbH
Double U-pipe system - simplified planning
1 pipe system
FAS-420-TP1
FAS-420-TT1
2 pipe systems
FAS-420-TP2
FAS-420-TT2
FAS / FCS
FAS / FCS
d
d
TITANUSP RO ·SENS 2
®
1
2
i
1
2
3
4
5
6
7
8
9
10
i
12
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Double U-pipe system, e.g. for equipment protection
Limiting values Min. distance FAS-420 – last T-fitting 2m
Double U-pipe Max. distance FAS-420 – last T-fitting 20m
Max. branch length 20m
Max. overall pipe length (Ø 25mm) 100m
Min. distance between air sampling openings (d) 0.1m
Max. distance between air sampling openings (d) 4m
Max. number of air sampling openings (n) per pipe system 20
Double U-pipe Number of air sampling openings
4 8 12 16 20
Ø of all air sampling openings in mm
a
4.0 3.4 3.0 2.5 2.0
a
Punch diameter of the aspiration reducing film sheet
4.9 Planning for long pipe feed lines
Notice!
Only to be used when taking over inventory planning
Pipes with a 40mm diameter are required for planning pipe feed line A. Area B is designed
with 25mm pipes in accordance with
Standard pipe planning, page 39
. The plan applies for