EasyManua.ls Logo

Bosch NGT73 User Manual

Bosch NGT73
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BOSCH
INSTALLATION INSTRUCTIONS MANUAL
STEEL GAS COOKTOPS with FULL-SURFACE GRATES
30" MODELS: NGT73, NGP73
36" MODELS: NGT93, NGP93
PLEASE READ INSTRUCTION BEFORE PROCEEDING
IMPORTANT: Save these instructions for the local electrical inspector's use.
INSTALLER: Please leave these Installation Instructions with this unit for the owner.
OWNER: Please retain these instructions for future reference.
Important Safety Instructions
Installation must conform with local codes or, in
the absence of local codes, with the National Fuel
Gas Code,ANSI Z223. I.
The appliance must be electrically grounded in ac-
cordance with local codes or, in the absence of
local codes,with the National Electrical CocleANSI/
NFPA 70, latest edition. (In Canada, installation must
be in accordance with the CAN I-BI49.1 and .2
Installation Codes for Gas BurningAppliances and/
or local codes )
This appliance has been tested in accordance with
ANS Z2 I. I, Standard for Household CooldngAp-
pliances (USA) and in accordance with CANI.I-M8 I
Interim Reqt #58 Domestic Gas Cool<tops
(CANADA).
A WARNING: Improper installation, ad-
justment, alteration, service or mainte-
nance can cause injury or property damage. Re-
fer to this manual. For assistance or additional
information consult a qualified installer, service
agency, manufacturer or the gas supplier.
The cool<top must be used in conjunction with a
suitable ventilation system.
Power Requirements and Grounding
Power Supply: 120Volts, ISAmpere, 60 Hz.This appliance is
factory equipped with a S-foot power supply cord with a 3-
prong grounding plug (with polarized parallel blades).
TO PREVENT ELECTRICAL SHOCK, THE THIRD
GROUND PRONG SHOULD NOT UNDER ANY
CIRCUMSTANCES, BE CUT OR REMOVED. IT
MUST BE PLUGGED INTO A MATCHING GROUND-
ING TYPE RECEPTACLEAND CONNECTEDTOA COR-
RECTLY POLARIZED 120-VOLT CIRCUIT. A separate
circuit is recommended which is in compliance
with the NEC.
If there is any doubt as to whether the wall receptacle
is property grounded, the customer should have it
checked by a qualified electrician.
CAUTION: Before you plug in an electrical cord,
be sure all controls are in the OFF position.
Gas Requirements
Supply Pressure
Natural Gas - 6 inches water column
(14.9 Millibars) minimum.
Propane Gas - I I inches water column
(27.4 Millibars) minimum.
The maximum gas pressure to this appliance is not to
exceed 14.0 inches water column (34.9 MB).
PROPANE GAS INSTALLATION
The propane gas tank must be equipped with its own
high pressure regulator in addition to the pressure regu-
lator supplied with this unit.
The cool<top is shipped from the factory for use with
natural gas. For use with LR a conversion kit is re-
quired and must be purchased separately. Contact BSH
or your retailer to obtain Idt # NEZI065. A qualified
technician or installer must do the conversion.
Leak testing of the appliance shall be conducted
according to manufacturer's instructions.
Do Not Discard This Sheet

Other manuals for Bosch NGT73

Question and Answer IconNeed help?

Do you have a question about the Bosch NGT73 and is the answer not in the manual?

Bosch NGT73 Specifications

General IconGeneral
BrandBosch
ModelNGT73
CategoryCooktop
Fuel TypeGas
Gas TypeNatural Gas

Summary

Important Safety Instructions

Power Requirements and Grounding

Gas Requirements

Supply Pressure

Details minimum supply pressure for Natural Gas and Propane.

PROPANE GAS INSTALLATION

Instructions for converting and installing for propane gas.

CABINET CONSIDERATIONS AND COUNTERTOP CUTOUT

Figure I - Installed Dimensions (from cooktop edges)

Diagram showing clearance requirements for installation.

Figure 2

Diagram detailing cutout dimensions and clearances.

INSTALLING THE COOKTOP

Seal the Cooktop

Instructions for applying foam tape and heat reflective tape.

Attach Brackets to the Cooktop

Procedure for attaching hold-down brackets to the rough-in box.

Install the Cooktop

Steps for inserting and securing the cooktop to the countertop.

Connect Gas Supply

Guidance on connecting the gas supply line and regulator.

Final Check

Connect Electrical Supply

Instructions for connecting the power cord to the receptacle.

Final Check

Steps for verifying burner operation and flame characteristics.

Related product manuals