EasyManua.ls Logo

BPC instruments AMPTS III - Page 17

BPC instruments AMPTS III
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Step 7: Add distilled water inside the FCU and place them on the detection unit.
Make sure that each FCU is perfectly seated (horizontally levelled) on the BPC Core AMPTS
Unit. It can be easily observed by checking the FCU level indicator and the level control from
the software or the OLED screen as shown below. Adjustable feet are used to level the
instrument.
The BPC Core AMPTS Unit is equipped with an OLED screen that provides information
regarding the status of the instrument (environmental conditions, time, current IP address
used by the instrument and alignment indicator). This can be accessed through two physical
buttons located below the screen.