EasyManua.ls Logo

BPC instruments AMPTS III - Page 18

BPC instruments AMPTS III
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Backside of the BPC Core AMPTS Unit:
Step 8: Cut 36 (AMPTS III) or 18 (AMPTS III Light) pieces of festo tubing sufficient in length to
connect the gas outlet of each reactor to the corresponding alkaline solution bottle (Unit B)
and then a second piece to couple the glass bottle with NaOH solution to the FCU. In order to
simplify this procedure, use push-in connectors (two per channel) provided with the
instrument. To avoid water flowing back from Unit C to Unit B, check valves can be inserted
close to the inlet of each FCU in order to the target substance flow in one direction only.
NOTE: If the user wants to flush the reactors to create the anaerobic environment, disconnect
the tubing from the CO
2
-absorption unit before to eliminate the risk of damaging the external
check valves (if used) by the high-pressure gas flow.