EasyManua.ls Logo

Bradford White RG2PV60T User Manual

Bradford White RG2PV60T
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Save this manual for future reference
Manual 238-51540-00D 4/19
SERVICE
MANUAL
Troubleshooting Guide
and Instructions for Service
(To be performed ONLY by
qualified service providers)
Models Covered
by This Manual:
ThroughTheWall Models:
RG1PV40S*(N,X)
RG1PV50S*(N,X)
RG1PV55H*(N,X)
RG2PV40T*(N,X)
RG2PV50H*(N,X)
RG2PV50T*(N,X)
RG2PV75H*(N,X)
RG2PV60T*(N,X)
LG1PV55H78*(N,X)
LG2PV50H65*(N,X)
LG2PV75H76*(N,X)
(*) Denotes Warranty Years
Power Vent Gas Water Heaters
PV Series
Question and Answer IconNeed help?

Do you have a question about the Bradford White RG2PV60T and is the answer not in the manual?

Bradford White RG2PV60T Specifications

General IconGeneral
CategoryResidential
Capacity60 gallons
Energy SourceNatural Gas
Height60.75 inches
Diameter24 inches
First Hour Rating90 gallons
Recovery Rate40 gallons per hour
Warranty6-Year Limited Tank & Parts
BTU Input40, 000 BTU
Fuel TypeNatural Gas
Energy Factor0.62
TypeGas

Summary

PV Series Operation, Controls, and Troubleshooting

PV Series Troubleshooting Guide

Correlates LED flash codes with faults, causes, and service procedures.

PV Series Service Procedures: Maintenance and Repair

Burner Inspection, Cleaning, and Replacement

Procedures for inspecting, cleaning, and replacing the burner assembly.

Pilot Inspection, Testing, and Replacement

Steps for inspecting, testing continuity, and replacing the pilot assembly.

Pressure Switch Testing and Replacement

Diagnostic steps to test pressure switch functionality and replace it.

Blower Testing and Replacement

Procedures to test blower operation and replace the blower motor.

Blower Temperature Switch Service

Testing and replacing the blower temperature switch.

Gas Control Testing and Replacement

Procedures for gas control testing, ECO reset, and component replacement.

Related product manuals