EasyManua.ls Logo

Bradford White RG2PV40T User Manual

Bradford White RG2PV40T
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Save this manual for future reference
Manual 238-51540-00A 3/15
SERVICE
MANUAL
Troubleshooting Guide
and Instructions for Service
(To be performed ONLY by
qualified service providers)
Models Covered
by This Manual:
RG1PV40S*(N,X)
RG1PV50S*(N,X)
RG1PV55H*(N,X)
RG2PV40T*(N,X)
RG2PV50H*(N,X)
RG2PV50T*(N,X)
RG2PV75H*(N,X)
LG1PV55H78*(N,X)
LG2PV50H65*(N,X)
LG2PV75H76*(N,X)
(*) Denotes Warranty Years
Through-The-Wall Gas Water Heaters
PV Series

Questions and Answers:

Bradford White RG2PV40T Specifications

General IconGeneral
BrandBradford White
ModelRG2PV40T
CategoryWater Heater
LanguageEnglish

Summary

Troubleshooting

PV Service Procedure I: Burner Inspection, Cleaning and Replacement

Burner Cleaning

Step-by-step guide for cleaning the burner assembly, including orifice inspection and reassembly.

PV Service Procedure II: Pilot Inspection, Testing and Replacement

Pilot Inspection, Testing and Replacement

Provides instructions for inspecting, testing, and replacing the pilot assembly and igniter/flame sensor.

PV Service Procedure III: Pressure Switch Testing and Replacement

Pressure Switch Testing

Details how to test the pressure switch function using a multimeter and checks for vent system blockage.

Pressure Switch Replacement

Step-by-step guide for safely removing and replacing the pressure switch.

PV Service Procedure IV: Blower Testing and Replacement

Blower Testing

Outlines electrical and pressure testing procedures for the blower assembly.

PV Service Procedure V: Blower Temperature Switch Testing and Replacement

Blower Temperature Switch Testing

Describes how to test the blower temperature switch using a multimeter and checking exhaust temperatures.

Blower Temperature Switch Replacement

Provides detailed steps for replacing the blower temperature switch.

PV Service Procedure VI: Gas Control Testing and Replacement

Gas Control Disassembly/Reassembly

Step-by-step guide for safely removing and reinstalling the gas control unit.

Temperature Sensor Testing

Explains how to test the temperature sensor's resistance and diagnose related faults.

PV Service Procedure VII: Flammable Vapor/Simulative Resistance Device Testing

PV Service Procedure VIII: Safety Circuit Voltage Trace

PV Service Procedure IX: 115 VAC Circuit Trace

PV Service Procedure X: Diptube Inspection & Replacement

PV Service Procedure XI: Anode Inspection & Replacement

PV Service Procedure XII: Flue Baffle Inspection & Replacement

PV Service Procedure XIII: Inner Door/Gasket Removal, Inspection & Replacement

Related product manuals