E. Fasten heater head (with hose now attached and leak-
tested) to the top of pole.. Tighten securely using 4 pcs
M6X10
(Figure 6). Do not remove any bolts.
Figure 6
F.
**MANDATORY LEAK TEST REQUIRED** Refer to page 4, see header:
“LEAK TESTING THE CONNECTIONS“
Proceed to test gas system as indicated on page 4. Make sure to test hose and all
connections for leaks. Lift burner head and test hose connection to burner head.
G. Place burner head so control button is vertically aligned with the instructions label on the
post. Place 1 steel washer over each of the 3 bolts (Figure 7). Install reflector over burner
head through bolts. Place steel washers over each bolt (Figure 8). Secure reflector with
wing nuts.
Figure 8Figure 7