Page 42
Decals and Antiskid
Decals
MANUAL OPERATION
O
P
E
N
C
L
O
S
E
O
P
E
N
C
L
O
S
E
OPEN
VALVE
CLOSE
W
A
R
N
I
N
G
81
8
2
3
Pus
h
T
-handle
in
fu
l
ly and
m
a
nu
al
ly m
ov
e
p
latform
in
and o
ut
t
o enga
g
e
p
latform
lo
c
k
b
e
f
ore
d
ri
ving
v
ehi
c
le
.
F
ai
lure
to
l
o
c
k
pl
a
tf
o
rm
ma
y
re
sult
i
n unint
ended
p
latfor
m
d
e
plo
y
ment. Uni
n
t
e
nd
ed
p
l
a
tf
o
r
m
d
e
ploym
e
n
t m
a
y
res
ult
in s
er
i
o
us
b
od
i
ly
i
n
jury
and/o
r
pr
oper
t
y
d
a
m
a
g
e.
D
o not remove!
W
A
R
N
I
N
G
81
823
Pus
h T-
h
a
n
dl
e
in
f
ully an
d
m
a
nually mo
v
e
pla
tf
o
rm
i
n
and
o
u
t
t
o e
ng
a
g
e
pl
atf
or
m
l
oc
k
b
e
fo
r
e
d
ri
vi
n
g
v
e
h
ic
le.
Fa
i
lu
r
e
to
l
o
c
k p
lat
f
o
r
m
m
ay
re
s
ult
i
n uninte
nd
ed p
la
t
f
or
m
de
ploy
m
e
n
t.
U
ni
nt
e
n
de
d
pl
atf
o
rm d
ep
loy
m
ent
ma
y
re
s
ult
i
n ser
i
ou
s
b
odily in
j
ury
an
d
/
o
r
pro
pe
rt
y
d
a
ma
g
e
.
Do not
remove!
OUTER BARRIER
Detent
Pin
PLATFORM
Actuator
Hairpin
Cotter
OUT (TO EXTEND PLATFORM):
1. Pull T-Handle.
2. Turn T-Handle to lock platform
in released position.
3. Pull platform out.
4. Turn T-Handle.
5. Push T-Handle in.
6. Turn T-Handle to lock platform
in engaged position.
DOWN (TO LOWER PLATFORM):
Using hand pump handle, open
hand pump valve (turn counter-
clockwise). Open 1/2 turn only.
DOWN (TO UNFOLD
OUTER BARRIER):
1. Remove hairpin cotter
from detent pin.
2. Remove detent pin.
3. Unfold (rotate) barrier
down.
UP (TO FOLD
OUTER BARRIER):
1. Fold (rotate) barrier up.
2. Insert detent pin.
3. Insert hairpin cotter
in detent pin.
UP (TO RAISE PLATFORM):
Using hand pump handle:
1. Close hand pump valve (turn
clockwise).
2. Insert handle in pump and stroke.
Note: Close valve before
operating electric pump.
IN (TO STOW PLATFORM):
1. Raise or lower platform to stow
level (follow UP or DOWN
procedures).
2. Pull T-Handle.
3. Turn T-Handle to lock platform
in released position.
4. Push platform in.
5. Turn T-Handle.
6. Push T-Handle in.
7. Turn T-Handle to lock platform
in engaged position.
Read operator's manual for further details.
DOT — Public Use Lift
31409
31409
"Providing Access to the World"
1-800-THE LIFT www.braunlift.com
12375
®
Parking Courtesy
Requested
12375
33602
W
A
RNING
Before
stowing
lift:
(Steps 1-3)
After
deploying
lift:
(Reverse
procedures)
1. Fold outer barrier down.
HANDRAIL INSTRUCTIONS
Latch Handle Detail
Latch Handle Detail
2. a. Lift latch handle.
b. Deploy / Stow handrail.
c. Lower latch handle.
3. a. Lift latch handle.
b. Deploy / Stow handrail.
c. Lower latch handle.
Before stowing lift:
• Lower outer barrier
down to platform.
• Lower handrails down
to platform.
• Lower latch handles
down to platform.
Failure to follow these
precautions may result
in serious bodily injury
and/or property damage.
JKA
JKA
a.
c.
JKA
a.
c.
33602
b.
b.
29884
www.braunlift.com
31937
31937
81821
81821
W
A
RNING
Read lift operating
instructions before
operating lift.
Failure to do so
may result in
serious bodily
injury and/or
property damage.
34590
34590
34585
34585
W
A
RNING
• Read manual before operating lift.
• Load and unload on level surface only.
• Engage vehicle parking brake before
operating lift.
• Provide adequate clearance outside of
vehicle to accommodate lift.
• Do not operate lift if you suspect lift
damage, wear or any abnormal condition.
• Keep operator and bystanders clear of
area in which lift operates.
• Handrail latch handles must be down
except when stowing and deploying
handrails.
Whenever a wheelchair passenger
is on the platform, the:
• Handrail belt must be latched.
• Passenger must be positioned fully
inside yellow boundaries
• Wheelchair brakes must be locked
• Inner roll stop and outer barrier
must be up.
Failure to follow these rules may result
in serious bodily injury and/or property
damage.
LIFT OPERATING INSTRUCTIONS
DOT — Public Use Lift
TO DEPLOY PLATFORM:
1. Stand clear and press UP switch until
platform extends fully. Release switch.
2. Lift handrail latch handles, deploy
handrails up to vertical position and
lower latch handles fully.
3. Lift outer barrier to vertical position.
4. Latch handrail belt.
5. Press UP switch until platform stops.
6. Open bus door fully.
7. Press UP switch until platform stops
(raises to floor level), and inner
roll stop unfolds to floor level.
TO UNLOAD PASSENGER:
1. Load passenger onto platform and
lock wheelchair brakes.
2. Press DOWN switch until platform stops.
3. Close bus door fully.
4. Press DOWN switch until the entire
platform reaches ground level and
outer barrier unfolds fully.
5. Unlatch handrail belt, unlock
wheelchair brakes and unload
passenger from platform.
TO LOAD PASSENGER:
1. Load passenger onto platform, lock
wheelchair brakes and latch handrail
belt.
2. Press UP switch to fold outer barrier
up and raise platform until platform
stops.
3. Open bus door fully.
4. Press UP switch until platform stops
(raises to floor level), and inner
roll stop unfolds to floor level.
5. Unlock wheelchair brakes and unload
passenger from platform.
TO STOW PLATFORM:
1. Latch handrail belt.
2. Press STOW switch until platform
stops at stow level.
3. Unlatch handrail belt.
4. Fold outer barrier down to platform
(horizontal) position.
5. Lift handrail latch handles, stow
handrails down to platform (horizontal)
position and lower latch handles fully.
6. Press STOW switch until platform
stops (retracts fully).