Page 45
Maintenance and Lubrication
All listed inspection, lubrication and maintenance
procedures should be repeated at 750 cycle
intervals following the scheduled 4500 cycle
maintenance procedures. These intervals are
a general guideline for scheduling maintenance
procedures and will vary according to lift use and
conditions. Lifts exposed to severe conditions
(weather, environment, contamination, heavy
usage, etc.) may require inspection and mainte-
nance procedures to be performed more often
than specified.
Maintenance Indicator: The Lift Ready green
LED, mounted on the hand-held pendant storage
bracket, will change color to yellow after every
750 cycles. The yellow LED will not affect the
functions of the lift, but is a reminder to complete
necessary maintenance and lubrication proce-
dures. Once the lift has been serviced, press the
CYCLE button (located below LCD display on the
control board) until the Lift Ready LED changes
back to green. The CYCLE button also clears
the lift cycle count (since last service) but not the
lifetime cycle count.
Discontinue lift use immediately if maintenance
and lubrication procedures are not properly per-
formed, or if there is any sign of wear, damage
or improper operation. Contact your sales repre-
sentative or call The Braun Corporation at 1-800-
THE LIFT
®
. One of our national Product Support
representatives will direct you to an authorized
service technician who will inspect your lift.
Specified (recommended) Available Braun
Lubricant Type Lubricant Amount Part No.
See the Maintenance/Lubrication Schedule for recommended applications per number of cycles.
LO - Light Oil
DE - Door-Ease
Synthetic Grease 12.5 oz.
(Multipurpose) Tube
SG - Synthetic Grease
15807
15806
28598
Light Penetrating Oil LPS2, General Purpose 16 oz.
(30 weight or equivalent) Penetrating Oil Aerosol Can
Stainless Stick Door-Ease
Style (tube) Stick (tube)
1.68 oz.
Mobiltemp SHC32