EasyManua.ls Logo

BRP ROTAX 916 i A Series - Page 176

BRP ROTAX 916 i A Series
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
MAINTENANCE MANUAL LINE
CHECK POP-OFF VALVE
NOTE
This functional check is to be performed on an assembled pop-off valve
assembly.
See Chapter 73-10-00 in Maintenance Manual Heavy (MMH) for the re-
spective engine type for removal, disassembly, inspection and assembly
and installation of the pop-off valve assy..
Step
Procedure
1 Loosen the 1-ear clamp and remove the control hose (2).
2
Connect a vacuum pump to the pop-off valve hose nipple (3).
3
Apply a vacuum of 700 mbar (10.15 psi.).
Figure 7.24: Oil tank
1
1-ear clamp
2 Control hose
3
Hose nipple
Step
Procedure
4
The piston must move smoothly and be fully open at 700 mbar (10.15 psi).
5
Release the vacuum, the piston will be returned to fully closed by internal
spring force.
12–20–00
Page 52
December 01 2023
Effectivity: 916 i A / C24
Edition 0/Rev. 1

Other manuals for BRP ROTAX 916 i A Series

Related product manuals