BRP-Rotax
MAINTENANCE MANUAL LINE
Shipment The appropriation for the overhaul must include the following:
1 Engine log book (including date and time of engine removal).
2
Maintenance records of the engine (i.e. all maintenance check lists, and re-
ports of operation, of maintenance, of findings and of oil analyses).
3 The engine assembly as per supply volume. Additionally all added-on parts
as in the supply volume such as filters, intake silencer, fuel pump, external
alternator, sensors, ignition unit, electric starter, oil tank.
4
Indication of total engine operating hours (TSN) and where applicable, en-
gine operating hours since a previous overhaul (TSO).
NOTE
This information must be supplied to allow the service history of com-
ponents to be traced.
5
ECU incl. a statement of the number of times it has been plugged in/
unplugged.
6 FUSE BOX incl. a statement of the number of times it has been plugged in/
unplugged.
7
Harness incl. a statement of the number of times it has been plugged in/
unplugged.
8 Data about the type of aircraft used.
9
Engine position if installed in a multi-engine aircraft.
10
Useful remarks and observations concerning the engine.
Effectivity: 916 i A / C24
Edition 0/Rev. 1
05–10–00
Page 5
December 01 2023