EasyManua.ls Logo

Buchi K-314 - Operation; Control Elements; Control Elements and Their Function

Buchi K-314
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
BÜCHI Distillation Unit K-314
5 Operation
5 Operation
Fig. 8: Arrangement and designation of the control and display elements
5.1 Control elements
Main switch
Pressure switch for adding the sodium hydroxide
solution
Steam tap
Digestion tube
Rubber bung with PTFE hose
Sample tube holder
Distillate outlet tube with PTFE hose
Receiver plate
Drip tray
Protective door
Connection nipple for cooling water inlet hose (IN)
Connection nipple for cooling water outlet hose (OUT)
Connection nipple for sodium hydroxide solution
(NaOH)
Connection nipple for water (H
2
O)
Connection nipple for drain
Mains connector with 2 fuses 20x5,10 AT
5.2 Control elements and their function
I / O After switching on the distillation unit, it takes
about 90 seconds before the unit is ready for
operation.
Before switching on, check that the supply tanks
and/or the hoses are filled with reagents.
NaOH Sodium hydroxide adding switch.
The alkali is dosed in as long as the switch is
pressed.
Steam Steam on / off.
Switching the distillation on and off manually.
Fig. 10: Control elements and their function
Fig. 9: Arrangement and designation of the connection nipples
I/O
NaOH
Steam

Related product manuals