EasyManua.ls Logo

Bunn A-10 - Preparing the Brewer for Use

Bunn A-10
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
PREPARING THE BREWER FOR USE
NOTE - THE BREWER IS
NOT READY TO PLUG IN
Raise the hinged flip lid.
Place the decanter on the warmer. Pour two pitchers of water
(filled to the top line) into the screened area on top of the brewer.
Wait two minutes between pitchers to allow the water to fill the
tank. When the tank is full, some water will flow through the
funnel and into the decanter.
Close the lid and plug in the brewer.
Press the bottom of the vacation switch, located on
the lower left side of the brewer, to the ON position.
The vacation switch controls power to the tank heater.
Initially you will have to wait approximately ten min-
utes in order for water to reach brew temperature.
P2078
P2079
P-214
P2080
10070 030100

Related product manuals