EasyManua.ls Logo

Bunn ICB SH - Initial Disassembly Steps; Faucet and Component Removal

Bunn ICB SH
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disconnect power to the brewer.
Remove the screws that secure the front
panel to the brewer (6 screws).
STEP 1
Carefully remove the front panel of the
brewer.
STEP 2
ICB SH Faucet Side Car Installation Instructions
Remove the three screws that secure the
cover to the faucet side car.
Remove the cover.
STEP 3
Open the faucet handle to drain water from
the tank. Keep the faucet handle open until
water is no longer dispensing.
Remove the hose snap clamp that secures
the tube to the faucet shank.
Carefully remove the hose from the faucet
shank.
STEP 4
Remove the two 8/32 nuts, two washers
and base screw from the faucet side car.
Remove the black silicone grommet.
STEP 5
Completely remove the faucet side car,
spacer and plate assembly from the left
side of the brewer.
STEP 6
Remove Cover
Remove Hose Snap
Remove Tube
Remove Nuts ,
Washers, Screws
& grommet
Spacer
Plate Assembly
Faucet Side Car

Other manuals for Bunn ICB SH

Related product manuals