EasyManua.ls Logo

Bunn LCA-2 PC User Manual

Bunn LCA-2 PC
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
! WARNING HOT LIQUIDS
! AVE
RTISSEMENT LIQUIDES CHAUDS
POWER
READY
POR
TION
RINSE
REFILL
STO
P
!
HOT
WATER
LCA-2
LCA-2 PC
LCC-2
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
34766.0000N 11/08 ©2002 Bunn-O-Matic Corporation
Question and Answer IconNeed help?

Do you have a question about the Bunn LCA-2 PC and is the answer not in the manual?

Bunn LCA-2 PC Specifications

General IconGeneral
CategoryDispenser
ManufacturerBunn
ModelLCA-2 PC
Product TypeCoffee Dispenser
Capacity2.0 gallons (7.6 liters)
MaterialStainless Steel
Voltage120 V
CertificationNSF, UL
Dispensing MechanismPush Button
Temperature ControlThermostatically controlled heating element

Summary

Electrical Requirements

Field Wiring Terminal Block Diagram (No Master ON/OFF)

Diagrams for field wiring terminal blocks for models without a master ON/OFF switch.

Field Wiring Terminal Block Diagram (With Master ON/OFF)

Diagrams for field wiring terminal blocks for models with a master ON/OFF switch.

Plumbing Requirements

Initial Set-up

Procedure for initial unboxing, placement, and leveling of the dispenser.

Plumbing Hook-up

Instructions for connecting the water supply line to the dispenser.

Setting Dispenser Flow Rate

Reprogramming Dispenser Flow Rate

Procedure to recalibrate the dispenser's flow rates after physical adjustments.

Selecting the Correct Pump Tubing

Installing the Pump Tubing

Step-by-step guide for replacing and installing pump tubing for optimal performance.

Operating Controls and Interface

Dispense and Selector Switches

Description of dispense handles, stop switch, hot water switch, and function/mode selectors.

Initial Fill & Heat

Programming the Dispenser

Dispenser Calibration Routines

Loading the Concentrate

Operating the Pull & Hold Dispenser

Operating the Preset Portion Control Dispenser

Cleaning & Preventative Maintenance

Replacing the Pump Tubing

Troubleshooting

Field Calibration of Concentrate Pumps/Flow Rates

Schematic Wiring Diagram (Models without Master ON/OFF Switch)

Schematic Wiring Diagram (Models with Master ON/OFF Switch)

Schematic Wiring Diagram (LCC-2A/LCA-2A Models)

Related product manuals