EasyManua.ls Logo

Bunn TB3 User Manual

Bunn TB3
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TB3
TB3-LP
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
37235.0000D 05/06 ©2004 Bunn-O-Matic Corporation www.bunn.com

Other manuals for Bunn TB3

Question and Answer IconNeed help?

Do you have a question about the Bunn TB3 and is the answer not in the manual?

Bunn TB3 Specifications

General IconGeneral
TypeCommercial Coffee Brewer
CategoryKitchen Appliances
ManufacturerBunn
ModelTB3
Voltage120V
MaterialStainless Steel
Temperature ControlYes
Brewing Capacity3 Gallons
Output3 Gallons per Hour
Product TypeCoffee Maker

Summary

Introduction to the Brewer

Bunn-O-Matic Commercial Product Warranty

User Notices and Safety Warnings

Brewer Timer Setting

Instructions for setting and modifying brew volumes and programming features.

Electrical Requirements

Plumbing Requirements

Initial Set-Up Procedure

Adjusting Brew Volumes

Auto Sweetener Set-up

Operating Controls Overview

Cleaning Procedures

Auto Sweetener Cleaning

Procedure for cleaning the auto sweetener system components.

Tea Brewing

Step-by-step instructions for brewing tea using the equipment.

Troubleshooting Common Issues

Service and Component Testing

Brew Solenoid Valve Testing and Replacement

Procedures for testing and replacing the brew solenoid valve.

Control Thermostat Testing and Replacement

Procedures for testing and replacing the control thermostat.

Digital Brew Timer Testing and Setting

Procedures for testing and setting the digital brew timer.

Dilution Solenoid Valve Testing and Replacement

Procedures for testing and replacing the dilution solenoid valve.

Dilution Timer Testing and Adjustment

Procedures for testing and adjusting the dilution timer.

Limit Thermostat Testing and Replacement

Procedures for testing and replacing the limit thermostat.

Start Switch Testing and Replacement

Procedures for testing and replacing the start switch.

ON/OFF Switch Testing and Replacement

Procedures for testing and replacing the ON/OFF switch.

UNSWEET/OFF/SWEET Switch Testing and Replacement

Procedures for testing and replacing the sweetener selector switch.

Sweetener Solenoid Valve Testing and Replacement

Procedures for testing and replacing the sweetener solenoid valve.

Tank Heater Testing and Replacement

Procedures for testing and replacing the tank heater.

Schematic Wiring Diagram TB3, TB3B, TB3-LP

Schematic Wiring Diagram TU3, TB3 W/Sweetener

Schematic Wiring Diagram TB3A

Schematic Wiring Diagram TB3B W/Half-Batch

Related product manuals