14 AIM-50™ Installation Manual Wall Mount Version 5000145 A01
Final Testing
Energize the light assembly by turning the wall switch on to check proper operation.
The arm system should swing easily within the range of motion as illustrated on page 6.
Adjusting Arm Tension
The spring inside the arm is pre-adjusted from the factory. If, however, the light-head drifts up or
down, please refer to the Operation & Maintenance manual for guidance on how to adjust this.
Static Inspection
NOTE: The static (structural) inspection must be carried out before the installation of the wall
or ceiling fastening.
The strength of the construction must be designed, checked and certified by a
structural engineer.
The respective regional construction regulations that apply must be followed.
If an erroneous hole is drilled by mistake (e.g. drilling of a reinforcement rod) the structural
engineer who is responsible must be contacted, since adequate static load distribution in the
ceiling may have been jeopardized.
Declaration of acceptance:
It is hereby certified that the supporting wall/ceiling and the anchoring of the AIM-50™
suspension system is safe and adequately strong.
Project: __________________________________
__________________________________
__________________________________
Anchoring (please check the one that is applicable):
- with counter-plate O
- other
O
Location: __________________________________
__________________________________
Signature/Stamp (Structural Engineer / Construction Authority)