EasyManua.ls Logo

BUSCH SB 0530 D2 - Maintenance; Maintenance Schedule

BUSCH SB 0530 D2
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 | Maintenance
12 / 24 0870145123_SB0050-1400D0_D2_A0000_IM_en
7 Maintenance
WARNING
Machines contaminated with hazardous material.
Risk of poisoning!
Risk of infection!
If the machine is contaminated with hazardous material:
Wear appropriate personal protective equipment.
CAUTION
Hot surface.
Risk of burns!
Prior to any action requiring touching the machine, let the machine cool down first.
Shut down the machine and lock against inadvertent start up.
Vent the connected lines to atmospheric pressure.
If necessary:
Disconnect all connections.
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The
intervals given below are desired to be considered as starting values which should be
shortened or extended as appropriate. Particularly harsh applications or heavy duty oper-
ation, such as high dust loads in the environment or in the process gas, other contamina-
tion or ingress of process material, can make it necessary to shorten the maintenance in-
tervals significantly.
Interval Maintenance work
Monthly Clean the machine from dust and dirt.
In case of an inlet filter being installed:
Check the inlet filter cartridge, replace if neces-
sary.
Every 6 months Clean the machine from dust and dirt.
Make sure that the electronic components and the
cooling fan are free from dust.
Yearly Carry out a visual inspection and clean the machine
from dust and dirt.
Check the electrical connections and the monitoring
devices.
Clean the inlet and outlet silencer.
Every 20000 hours, at the
latest after 5 years
Have a major overhaul on the machine (contact
Busch).

Related product manuals