EasyManua.ls Logo

BWT P-FI 400 - Loading the Filter Media; Siting

BWT P-FI 400
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. SITING
The ltration group must be installed on a at, level surface and at a distance of at least 3,5 m from the water
(French standard C15-100). The electrical supply must be protected by 30mA di󰀨erential circuit breaker.
The lter group should be installed close to a drain or waste line to facilitate evacuation of backwash water.
3. LOADING THE FILTER MEDIA
1
Unscrew and remove the ring.
2
Remove the lid/valve assembly (positioned upside-
down during transport).
3
Glueing the unions to the lid: The transparent union
to the waste outlet, the black or grey unions to the
pump inlet and outlet.
Caution: avoid using excess glue, this could
dammagethevalve
4
Screw in the drain plug.
14/32
2021/01 - Indice de révision : G - Code : 26650 FILTRATION