EasyManua.ls Logo

Camus Hydronics DFH/W1750 - User Manual

Camus Hydronics DFH/W1750
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
6226 Netherhart Road, Mississauga, Ontario, L5T 1B7
99-0050
Rev. 6.7
INSTALLATION OPERATION
AND SERVICE MANUAL
DYNAFLAME® SERIES
GAS FIRED COMMERCIAL COPPER TUBE AND STAINLESS
STEEL BOILERS
NON-CONDENSING
Models; DFH/W500, 750, 1100, 1200, 1500, 1750, 2000, 2500,
3000, 3500, 4000, 4500, 4504, 5000, 5004, 6004
NEAR-CONDENSING (DFX)
Models; DFH/W501, 751, 1101, 1201, 1501, 1751, 2001, 2501, 3001,
3501, 4001, 4501, 4514, 5001, 5014, 6014
CONDENSING
Models; DFH/W502, 752, 1102, 1202, 1502, 1752, 2002, 2502, 3002,
3502, 4002, 4502, 4524, 5002, 5024, 6024
H
HLW
W
W
A
A
R
R
N
N
I
I
N
N
G
G
:
:
If the information in these instructions is not followed
exactly, a fire or explosion may result causing property
damage, personal injury or death
Do not store or use gasoline or other flammable
vapours and liquids in the vicinity of this or any
other appliance.
WHAT TO DO IF YOU SMELL GAS
o Do not try to light any appliance,
o Do not touch any electrical switch; do not
use any phone in your building,
o Immediately call your gas supplier from a
neighbour’s phone. Follow the gas
supplier’s instructions,
o If you cannot reach your gas supplier, call
the fire department.
Qualified installer, service agency or the
gas supplier must perform installation and
service.
I
nstaller:
After installation, these instructions
must be given to the end user or left on or near the
appliance.
To the End User: This booklet contains important
information about this appliance. Retain for future
reference.
CAMUS® HYDRONICS LTD.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Camus Hydronics DFH/W1750 and is the answer not in the manual?

Summary

PART 1: GENERAL INFORMATION

1.5 HOW IT OPERATES (SEQUENCE OF OPERATION)

Describes the step-by-step operation sequence from startup to standby.

1.6.1 IGNITION PROCESS

Details the step-by-step process for igniting the burner and achieving stable flame.

1.6.2 HEAT TRANSFER PROCESS

Explains how heat is transferred within the appliance during operation.

1.7 CODES

Outlines the installation codes and standards the equipment must comply with.

1.12 INSTALLATION PROCEDURE AND LOCATION OF UNIT

Guides the installer on proper unit placement and installation requirements.

PART 2: AIR SUPPLY & VENTING

2.1 GENERAL VENTING GUIDE

Provides essential guidelines for all venting configurations and material selection.

2.1.1 CATEGORY I AND CATEGORY III VENTING

Explains venting requirements for non-condensing DynaFlame® models.

2.1.2 VENTING GUIDELINES FOR CATEGORY I AND;OR III VENTING

Details specific rules for Category I and III venting systems.

2.1.3 CATEGORY II AND CATEGORY IV VENTING

Outlines venting requirements for condensing DynaFlame® models.

2.1.4 VENTING GUIDELINES FOR CATEGORY II AND;OR IV VENTING

Provides specific rules for Category II and IV venting systems.

2.2.1 AIR REQUIRED FOR COMBUSTION AND VENTILATION

Details the requirements for combustion and ventilation air supply.

PART 3: GAS CONNECTION

3.1 GAS CONNECTION

Covers essential steps and considerations for connecting the gas supply.

3.4 AIR;GAS RATIO VALVE

Explains the function and types of air/gas ratio control valves used.

3.5 DIFFERENTIAL AIR PRESSURE (DF2000 -6004)

Details how differential air pressure affects appliance operation.

3.7 CHECKING GAS SUPPLY PRESSURE

Provides procedures for verifying gas supply pressure.

3.8 CHECKING DIFFERENTIAL AIR AND GAS PRESSURES (DF2000 - DF6000)

Explains how to check air and gas pressures for proper appliance tuning.

3.9 GAS TRAIN AND CONTROLS

Illustrates typical gas train configurations for different models.

PART 4: WATER CONNECTION

4.5 PRIMARY HEAT EXCHANGER

Explains the design and operating requirements of the primary heat exchanger.

4.8 CONDENSER HEAT RECOVERY MODULE (CHRM)

Details the CHRM's function and integration with the appliance.

PART 5: ELECTRICAL & CONTROLS

5.1 ELECTRICAL CONECTIONS

Outlines minimum voltage requirements and wiring connections.

5.2 VARIABLE FREQUENCY DRIVE (VFD)

Explains the function and operation of the Variable Frequency Drive.

5.9 ERROR TABLE

Lists and describes possible error codes and their meanings.

PART 6: SOLA CONTROL PANEL

6.2 CONFIGURE MENU

Guides users through accessing and navigating the control panel's configuration menus.

6.3 LEAD LAG SETUP

Explains the setup procedure for lead lag operation of multiple boilers.

6.4 LEAD LAG SETUP FOR UP TO 12 APPLIANCES

Details how to configure lead lag systems for multiple boilers.

PART 8: FIELD STARTUP PROCEDURE

8.1 CHECKING THE INSTALLATION

Provides a checklist for verifying the installation before startup.

8.2 CHECKING THE CONSTRUCTION

Details checks for wiring, connections, and initial operation sequences.

8.3 FIRE TESTING

Guides through the fire testing process, including CO2 adjustments.

8.4 COMISSIONING APPLIANCE

Outlines the final steps for commissioning the appliance after startup.

PART 9: TROUBLE SHOOTING

Incoming Power

Addresses issues related to power supply and transformer faults.

Transformer Tripped

Details troubleshooting steps for a tripped transformer.

Flame Failure

Addresses common causes and solutions for flame failure.

Flame Disappears During a Run Cycle

Provides steps for diagnosing why the flame might disappear during operation.

Sensor Not Connected

Guides on troubleshooting sensor connection issues.

Fan Not Turning

Provides steps for diagnosing a non-operational fan.

Flame Detection is out of Sync

Addresses issues where flame detection is not accurate.

Blank Display Screen

Guides on troubleshooting a blank display screen.

Internal Fault

Provides steps for diagnosing and resolving internal faults.

PART 10: MAINTENANCE

10.2 VISUALLY CHECK MAIN BURNER FLAMES

Details how to visually inspect main burner flames for proper operation.

10.5 BURNER MAINTENANCE

Covers annual inspection and cleaning of the burner.

PART 11: INSTALLATIONS

11.1 HEATING BOILER INSTALLATIONS

Outlines general requirements for heating boiler installations.

11.8 TEMPERATURE RISE AT FULL FIRING RATE

Guides on measuring and adjusting temperature rise for correct operation.

HONEYWELL SOLA LEAD LAG OPERATION

UP TO 9 BOILERS

Shows the wiring and configuration for a 9-boiler lead lag system.

UP TO 12 BOILERS

Depicts the wiring and configuration for a 12-boiler lead lag system.

Camus Hydronics DFH/W1750 Specifications

General IconGeneral
BrandCamus Hydronics
ModelDFH/W1750
CategoryBoiler
LanguageEnglish

Related product manuals